BYECOLD BKD-G0606-WLH/D 설치 및 작동 지침 - 페이지 8
{카테고리_이름} BYECOLD BKD-G0606-WLH/D에 대한 설치 및 작동 지침을 온라인으로 검색하거나 PDF를 다운로드하세요. BYECOLD BKD-G0606-WLH/D 15 페이지.
STRUCTURE
Fout!
①
Mirror Surface
③
Touch Switch
⑤
Mounting Brackets
INSTALLATION
(1)Choose the mounting position, keep the required minimum distances;
(2)Mark the positions for the bore holes onto the drilling template (D) if there are no
existing marks. Stick the drilling template on the wall;
(Front)
Fout!
○,
2
Fout!
②
LED Strip Light
④
Display Screen(Visible when double-click)
⑥
Temperature Humidity Sensor
5
(Back)
○,
5
○,
6