Cisco 4900M - Catalyst Switch 설치 매뉴얼 - 페이지 5

{카테고리_이름} Cisco 4900M - Catalyst Switch에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Cisco 4900M - Catalyst Switch 8 페이지. 10/100base-t
Cisco 4900M - Catalyst Switch에 대해서도 마찬가지입니다: 문제 해결 매뉴얼 (6 페이지)

Cisco 4900M - Catalyst Switch 설치 매뉴얼
Screws (x4)
RJ-45 Cable
(PN 804-182-00)
Hub (Port 1-8) to Tester Computer
RJ-45 Cable
(PN 804-182-01)
Hub (Port 1-8) to User Computer
Installing 10/100Base-T Hub Hardware
Catalyst 10/100Base-T Ethernet Hub Upgrade
5) Disconnect the two 10Base-T hub cables (pn 804-182-00 and pn
804-182-01) and the AC power cable from the10Base-T hub. Coil the
cables and leave them in the options bay.
6) Remove power cables from the IEEE bus expander. Coil the cables and
leave them in the options bay.
7) Slide the IEEE/10Base-T hub mounting plate out of the options bay.
8) Remove the IEEE bus extender (if present) from the IEEE/10Base-T hub
mounting plate by loosening the captive screw attaching the bus extender
to the mounting plate.
9) Remove the ethernet hub/IEEE mounting plate by removing the four
screws securing it to the mainframe.
The following steps describe how to install a 10/100Base-T ethernet hub.
1) Attach the IEEE bus extender (if present) to the new mounting plate (pn
467-533-00).
2) Insert the new mounting plate assembly (pn 806-833-00) into the
mainframe.
To facilitate cable connections to the 10/100Base-T hub and IEEE bus,
tighten the mounting plate assembly screws after attaching cables.
10Base-T Hub
Power Cable
to Main Vault Port J6
Mounting Plate
10Base-T Hub Mounting Assembly
5