Cisco 6509-NEB - Catalyst Switch 업그레이드 매뉴얼 - 페이지 17
{카테고리_이름} Cisco 6509-NEB - Catalyst Switch에 대한 업그레이드 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Cisco 6509-NEB - Catalyst Switch 24 페이지. Catalyst 6500 series chassis and module power and heat values
Cisco 6509-NEB - Catalyst Switch에 대해서도 마찬가지입니다: 데이터시트 (30 페이지), 기술 정보 (16 페이지)
Figure 14
Warning
When installing or replacing the unit, the ground connection must always be made first and
disconnected last. Statement 1046
Step 5
After ensuring that all wire connections are secure, reinstall the terminal block cover.
Replacing the Supervisor Engine
Before you can power up the system, you need to remove the supervisor engine from slot 1 (if a
redundant supervisor engine is present, remove it from slot 2) and install the Supervisor Engine 720 or
the Supervisor Engine 32 in slot 5 or 6.
Removing the Supervisor Engine
This section describes how to remove an existing supervisor engine from a chassis slot.
To remove a supervisor engine from the chassis, perform these steps:
Disconnect any network interface cables attached to the supervisor engine.
Step 1
Verify that the captive installation screws on all of the modules in the chassis are tight. This step assures
Step 2
that the space created by the removed supervisor engine is maintained.
Note
78-16162-02
DC-Input Wire Connections on the Terminal Block
48 V IN PU T 1
+
GN D
INP UT PO WE R
GO OD
RT N
-48 vd c GN D
If the captive installation screws are loose, the electromagnetic interference (EMI) gaskets on
the installed modules will push the modules toward the open slot, reducing the opening size and
making it difficult to install the replacement module.
Catalyst 6509-NEB Switch and Cisco OSR-7609 Router Upgrade Note
Replacing the Supervisor Engine
17