Shimano ALFINE Inter-11 딜러 매뉴얼 - 페이지 29
{카테고리_이름} Shimano ALFINE Inter-11에 대한 딜러 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Shimano ALFINE Inter-11 49 페이지.
![Shimano ALFINE Inter-11 딜러 매뉴얼](/uploads/products/server2/5078498/5078498.jpg)
INSTALLATION
Installation of the shifting cable
6
(A)
(A)
(z)
(B)
7
(D)
(E)
(y)
8
Turn the cable 60˚ counterclockwise and
attach it to the hook.
Set the inner cable in the pulley as
(H)
shown in the illustration and, while
holding the rubber cover, insert the
rubber bellows of the inner cable into
the slit in the cassette joint bracket (y)
(G)
and securely set the outer casing holder
unit into the outer casing holder of the
(y)
cassette joint (z). Be careful not to
(C)
damage the rubber bellows at this time.
(F)
Secure the cable to the frame with the
(y)
(z)
outer casing bands.
(A)
(y)
10 cm
(z)
15 cm
29
(A)
Hook
(A)
Rubber bellows
(B)
Outer casing holder unit
(C)
Rubber cover
(D)
Inner cable
(E)
Pulley
(F)
Bracket
(G)
Slit
(H)
Outer casing holder
NOTICE
Check that the inner cable is correctly seated
inside the pulley guide.
Guide
Guide
(A)
Outer casing bands