Siemens SINAMICS G120P VSD 시작하기 매뉴얼 - 페이지 11

{카테고리_이름} Siemens SINAMICS G120P VSD에 대한 시작하기 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Siemens SINAMICS G120P VSD 50 페이지.

Siemens SINAMICS G120P VSD 시작하기 매뉴얼
Building Technologies

4.3 EMC Compliant Install for IP55 Units

5 Assembly - Notes

Make sure the D-type adapter is not lost! You will need it to connect the operator panel to the control unit
through the front lid on drive units 0.37kW to 15kW.
Using the optional shielding plate will depend on the installer's preference. You should consider the number
of shielded signal cables - and therefore metal bonding glands required, compared to using nylon cable
glands and the shielding plate. Note that some kind of cable gland will always be required or the IP55/4
rating will be lost. Corrugated conduit adapters are not suitable as they do not seal out the humidity.
Page 11 of 50
Last Revised: 4/11/2011