Siemens SIWAREX WL230 BB-S SA 매뉴얼 - 페이지 14
{카테고리_이름} Siemens SIWAREX WL230 BB-S SA에 대한 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Siemens SIWAREX WL230 BB-S SA 36 페이지. Base plate and elastomer bearing bb-s sa
Siemens SIWAREX WL230 BB-S SA에 대해서도 마찬가지입니다: 사용 설명서 (48 페이지), 장비 매뉴얼 (50 페이지), 사용 설명서 (44 페이지)
Application planning
4.5 Guide elements
Figure 4-3
To ensure that no force components occur in the measuring direction, you must install guide
elements at precise right angles to the effective direction of the load cells.
Three guide elements are sufficient to statically fix a weighing platform or container.
Note
Weighing errors
With four guide elements, there is a risk of the guide elements mutually tensioning, which in turn
induces weighing errors. If you nevertheless want to use four guide elements, the guide
elements must be installed with a sufficient amount of play.
14
Arrangement of guide elements
SB-S CA
Manual, 06/2019, A5E47600142-AA