Siemens SIWAREX WL230 BB-S SA 매뉴얼 - 페이지 18

{카테고리_이름} Siemens SIWAREX WL230 BB-S SA에 대한 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Siemens SIWAREX WL230 BB-S SA 36 페이지. Base plate and elastomer bearing bb-s sa
Siemens SIWAREX WL230 BB-S SA에 대해서도 마찬가지입니다: 사용 설명서 (48 페이지), 장비 매뉴얼 (50 페이지), 사용 설명서 (44 페이지)

Siemens SIWAREX WL230 BB-S SA 매뉴얼
Installing/mounting

5.2 General notes on mounting

NOTICE
Incorrect assembly of the load cell
Damaging of load cells, installation parts or load bearing implement
With load cells of smaller rated loads, there is a risk of stretching the load cell bodies when
attaching force transfer devices, e.g. when tightening locknuts.
Torsional and bending moments, eccentric loads and transverse loads are disturbance
variables. These disturbance variables cause errors in the measuring result and can damage
the load cells and compact mounting units if the maximum limits are exceeded.
● To ensure safe use of the hoisting gear, provide indented claws or crane eyebolts on the
● Do not overload the load cells.
● Put the load bearing implement down slowly.
● Use overload protection that securely absorbs the desired loads. The overload protection
● Introduce the load in the measuring direction of the load cell.
● The mounting components normally allow so much room for movement that heat
NOTICE
Incorrect welding
Incorrect welding can damage the load cell.
● Do not conduct the welding current over the load cells.
NOTICE
Missing grounding of the load cell
Undesirable electrical currents can arise during lightning and damage the load cell.
● Bridge the load cells with highly flexible grounding cables. See the section Screw on the
5.2
General notes on mounting
The installation conditions vary widely. The dead load of the load bearing implement can be
very low or relatively high. You might be dealing with a container, platform or a roller table. The
following installation instructions therefore only describe the general procedures.
To protect the load cells from damage during installation, always set up the load bearing
implement on dummies.
18
load bearing implement.
permits a rise in weight unhindered until the setpoint weight is reached.
expansion will not result in lateral loading.
– Attach the grounding clamp of the welding unit making reliable contact close to the weld.
– Bridge the load cells with a highly flexible grounding cable. See the section Grounding
cable (Page 15).
– Disconnect the individual load cells.
grounding cable (Page 25).
SB-S CA
Manual, 06/2019, A5E47600142-AA