Siemens SIWAREX WL230 BB-S SA 사용 설명서 - 페이지 25
{카테고리_이름} Siemens SIWAREX WL230 BB-S SA에 대한 사용 설명서을 온라인으로 검색하거나 PDF를 다운로드하세요. Siemens SIWAREX WL230 BB-S SA 48 페이지. Base plate and elastomer bearing bb-s sa
Siemens SIWAREX WL230 BB-S SA에 대해서도 마찬가지입니다: 매뉴얼 (36 페이지), 장비 매뉴얼 (50 페이지), 사용 설명서 (44 페이지)
5.2
Installing the base plate and elastomeric bearing
5.2.1
General installation information
The installation conditions vary widely. The dead load of the load bearing implement can be
very low or relatively high. You might be dealing with a container, platform or a roller table.
The following installation instructions can therefore only describe the general procedures.
Always set up the load bearing implement on dummies to protect the load cells from damage
during installation.
The load bearing implement then only has to be raised a few millimeters from bracket to
bracket to position the elastomeric bearing unit. The following description of the installation is
based on this assumption.
Note
Maintenance-friendly design
When planning the layout, ensure that the load cells are easily accessible once they are
installed.
Depending on the installation conditions, the detailed procedure may deviate from the
following description.
5.2.2
Procedure
Overview
The following actions are required to install the elastomeric bearing.
1. Prepare the load cell
2. Prepare the base plate
3. Prepare the elastomeric bearing
4. Bolt the load cell to the base plate
5. Install the elastomeric bearing in the load cell
6. Install the elastomeric bearing unit
7. Check the installation
The actions are described in detail in the following.
SB-S SA
Operating Instructions, 03/2013, A5E31529044A-01
5.2 Installing the base plate and elastomeric bearing
Installation
25