Installation and Commissioning Guide

04.02. Minimum Service Access Areas and Airflow Clearances

* See Table Below for
clearance dimension
NOTES
• Do not scale drawing. All dimensions are in mm unless specified. Refer to corresponding unit dimensional drawing for
mounting hole details.
• Service Access Areas and Spaces for Airflow Clearances given above are suggested minimums based on the condition that the
spaces around the units are free from any obstructions and a walkway passage of 1000mm between the units or between the
unit and the outside perimeter is available.
• Minimum service access areas and spaces for airflow clearances are the responsibility of the installer, ActronAir will not be
held liable for any extra charges incurred due to lack of access and space for airflow.
08
80
A*
SERVICE
645
CLEARANCE
20
337.5
Model
485
ERQ2-16AS / ERQ3-18AS
O/A
ERQ5-21AS / ERQ5-24AS
Installation & Commissioning Guide - ESP Platinum QUE Split Ducted Units
Doc. No.0525-061 Ver. 1 190131
ESP Platinum QUE - Three Phase
1470 O/A
DUCT WORK
1190
120
INDOOR COIL
EC INDOOR FAN
DUCT WORK
715
337.5
20
A
B
SUPPLY AIR
800
800
890
890
85
1430
130
GAS PIPE
Ø 25.4mm (1")
B*
SWAGED
SERVICE
LIQUID PIPE
Ø 12.7mm (1/2")
CLEARANCE
SWAGED
(ELECTRICAL)
695 O/A
40
605
35
Height
Clearance
380
340
SUPPLY
AIR
410
70
SAFETY DRAIN TRAY
CONDENSATE DRAIN
Ø 25mm ID
Ø 25mm ID
50
25
410
RETURN
AIR
50