Cisco N540-Front Haul 설치 준비 - 페이지 11
{카테고리_이름} Cisco N540-Front Haul에 대한 설치 준비을 온라인으로 검색하거나 PDF를 다운로드하세요. Cisco N540-Front Haul 14 페이지.
![Cisco N540-Front Haul 설치 준비](/uploads/products/server2/554938/554938.jpg)
Prepare for Installation
Figure 5: Wearing the ESD Strap
Prepare Rack for Router Installation
Install the chassis into a two-post standard rack with standard horizontal mounting rails. Before you mount
the chassis into the rack, we recommend that you do the following:
Step 1
Place the rack where you plan to install the chassis. Ensure that the rack is grounded to earth.
Step 2
Secure the rack to the floor.
To bolt the rack to the floor, a floor bolt kit (also called an anchor embedment kit) is required. For information on bolting
the rack to the floor, consult a company that specializes in floor mounting kits (such as Hilti; see
Make sure that floor mounting bolts are accessible, especially if an annual retorquing of bolts is required.
Prepare Rack for Router Installation
Hilti.com
for details).
Prepare for Installation
11