Cisco N540X-6Z18G-SYS-D 매뉴얼 - 페이지 16

{카테고리_이름} Cisco N540X-6Z18G-SYS-D에 대한 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Cisco N540X-6Z18G-SYS-D 30 페이지.
Cisco N540X-6Z18G-SYS-D에 대해서도 마찬가지입니다: 설치 준비 (14 페이지)

Cisco N540X-6Z18G-SYS-D 매뉴얼
Install the AC Power Cables
e. Place the grounding lug against the grounding pad so that there is solid metal-to-metal contact, and
f. Ensure that the lug and cable do not interfere with other equipment.
g. Prepare the other end of the grounding cable and connect it to an appropriate grounding point in your
Install the AC Power Cables
To install the AC power cables in the power supply slots:
1. Plug the power supply cord in to the power supply module.
2. Wrap the tie around the power supply cord.
3. Ensure that the power supply cord is secured to the power supply module.
4. Tighten the tie around the power supply cord as shown.
Note
Activate an AC Power Supply Module
Perform the following procedure to activate an AC power supply:
1. Plug the power cord into the power supply.
Install the Device
16
insert the two #10-32 pan head Phillips screws with washers through the holes in the grounding lug
and into the grounding pad.
site to ensure adequate earth ground.
These images are for only representation purposes. Certain variants of Cisco NCS 540 routers don't
include a tie for the power supply cord.
Install the Device