Cisco Performance Routing Engine 5 하드웨어 설치 매뉴얼 - 페이지 26
{카테고리_이름} Cisco Performance Routing Engine 5에 대한 하드웨어 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Cisco Performance Routing Engine 5 35 페이지.
Cisco Performance Routing Engine 5에 대해서도 마찬가지입니다: 빠른 시작 매뉴얼 (2 페이지)
![Cisco Performance Routing Engine 5 하드웨어 설치 매뉴얼](/uploads/products/server2/556722/556722.png)
Figure 13: Routing of the PRE5 Module Wires
1
Board-to-board cables
2
Backhaul cables
Troubleshooting the Cisco PRE5 Module Installation
At system startup, the following sequence should appear on the primary PRE:
1. The FAIL LED should briefly come on (yellow) and go off, and the STATUS LED should start flashing (yellow).
A series of messages should appear on the PRE alphanumeric display, indicating the progress of the boot sequence.
2. On successful completion of the boot sequence, the message IOS RUN should appear on the alphanumeric display.
3. The STATUS LED should be on (green) to indicate that this is the primary PRE.
The sequence on the redundant PRE is similar, except that the STATUS LED remains OFF and the messages on the alphanumeric
display are slightly different. The final message upon a successful boot sequence should be IOS STBY to indicate that the PRE is in
the standby state.
26