Cisco ACS-GSR12-CCBLM 설치 지침 매뉴얼 - 페이지 10
{카테고리_이름} Cisco ACS-GSR12-CCBLM에 대한 설치 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Cisco ACS-GSR12-CCBLM 14 페이지. Gigabit switch router cablemanagement kit
Removing and Replacing the Cable-Management System
Step 6
Step 7
Installing a Vertical Cable-Management Bracket
If you have installed a new line card in your Cisco 12012, you need to install a vertical
cable-management bracket to keep the interface cables organized. The vertical cable-management
bracket attaches to the line card faceplate with two captive screws; the interface cables are secured
with clips.
Perform the following steps to install a vertical cable-management bracket:
Step 1
Step 2
Step 3
10 Cisco 12012 Gigabit Switch Router Cable- Management Kit Installation Instructions
Loosen the two captive screws at the top and bottom of the vertical cable-management
bracket.
Remove the vertical cable-management bracket from the line card.
Attach an antistatic wrist strap to yourself and to one of the two ESD connection sockets
located on the front edges of the upper card cage or to bare metal on the frame.
Attach the vertical cable-management bracket to the line card. Secure the bracket in place
with two captive screws.
Carefully route the line card interface cables up through the horizontal cable-management
tray and exit the horizontal tray either to the left side or the right side.