Cisco ASA 5585-X 유지 관리 매뉴얼 - 페이지 3

{카테고리_이름} Cisco ASA 5585-X에 대한 유지 관리 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Cisco ASA 5585-X 44 페이지. Maintenance and upgrade procedures
Cisco ASA 5585-X에 대해서도 마찬가지입니다: 빠른 시작 매뉴얼 (40 페이지), 빠른 시작 매뉴얼 (6 페이지)

Cisco ASA 5585-X 유지 관리 매뉴얼
Chapter 4
Maintenance and Upgrade Procedures
Grasp the ejection levers at the left and right bottom of the module slot and pull them out.
Step 8
2
1
Module
Grasp the sides of the module and pull it all the way out of the chassis.
Step 9
Install the new module by lining it up with the slot. first ensuring the ejection levers are extended.
Step 10
2
1
Module
Step 11
Slide the module into the slot until it is seated and then push the ejection levers into place.
Insert and tighten the captive screws.
Step 12
Reconnect the power cable to the ASA 5585-X.
Step 13
Power on the ASA 5585-X.
Step 14
Press Enter to confirm.
Step 15
Verify that the PWR indicator on the front panel is green.
Step 16
OL-22567-02
SF P1
SF P0
7
6
5
4
3
2
1
0
1
MG MT
SF P1
SF P0
7
6
5
4
3
2
1
SF P1
SF P0
7
6
5
4
3
2
1
0
1
MG MT
SF P1
SF P0
7
6
5
4
3
2
1
Cisco ASA 5585-X Adaptive Security Appliance Hardware Installation Guide
0
0
1
US B
AU X
CO NS OL
RE SE T
E
1
0
0
1
MG MT
0
1
US B
AU X
2
2
Ejection levers
0
0
1
US B
AU X
CO NS OL
RE SE T
E
1
0
0
1
MG MT
0
1
US B
AU X
2
2
Ejection levers
Removing and Installing SSPs
CO NS OL
RE SE T
E
CO NS OL
RE SE T
E
4-3