Cisco CSC-C2FCIT 설치 및 업그레이드 - 페이지 23
{카테고리_이름} Cisco CSC-C2FCIT에 대한 설치 및 업그레이드을 온라인으로 검색하거나 PDF를 다운로드하세요. Cisco CSC-C2FCIT 32 페이지. Fddi card and appliques
Step 3
Caution
maintain this relationship will prevent the FDDI interface from initializing. For the optical bypass
switch, PHY-A from the network goes to PHY-B on the switch, and PHY-B from the network goes
to PHY-A on the switch. Some signal degradation will occur with the optical bypass switch installed
in the FDDI ring.
Step 4
Testing the Installation
After you have installed your new FDDI module, verify the installation (before replacing the front
panel) by taking the following steps.
Caution
Apply power to the chassis only long enough to go through the configuration dialog routine, check
LEDs, and verify proper system operation. Replace the front panel if it is necessary to leave on the
power to the chassis for some time.
Step 1
Note
Step 2
Step 3
Note
functions and show commands in depth.
Multimode connections—Attach the fiber-optic MIC cables from the FDDI network to the
PHY-A and PHY-B connectors on the applique. (See Figures 2 through 5.)
Single-mode connections—Attach the single-mode cables from the network to the
appropriate transmit (XMT) A or B and receive (RCV) A or B connections on the FDDI
applique.
Maintain the correct A-to-B and B-to-A relationship with the FDDI connectors. Failure to
Attach all other external cables to the appropriate applique connectors on the rear panel and
loosely place the top cover on the chassis. Leave the front panel off until you finish testing
the installation.
With the front panel removed and power on, the chassis is susceptible to overheating.
Turn ON the system power and allow the system to boot.
In order to test the microcode EPROM installation, step 2 is unnecessary.
Go through the configuration dialog (or setup) routine to assign an address and subnet
mask to each new FDDI interface you have installed.
Observe the LED status indicators on the CCTL2 card and the FDDI applique, and then use
the EXEC show commands to verify that your interfaces are recognized and have been
assigned port (unit) addresses by the system.
In order to test the microcode EPROM installation, the following sections discuss the LED
Installing and Upgrading the CSC-C2FCIT FDDI Card and Appliques
Testing the Installation
23