Ground the Chassis
Figure 10: Attach the Grounding Lug
Step 6
Make sure that the lug and cable do not interfere with other equipment.
Step 7
Prepare the other end of the grounding cable and connect it to an appropriate grounding point in your site to ensure
adequate earth ground.
What to do next
Install the FIPS opacity shield if necessary. See
the FIPS Opacity Shield in a Four-Post Rack
Install the cables according to your default software configuration as described in the
Getting Started
Rack-Mount and Ground the Chassis
12
Guide.
Install the FIPS Opacity Shield in a Two-Post Rack
for the procedure.
Rack-Mount and Ground the Chassis
and
Install
Cisco Firepower 2100