Cisco Firepower 4120 매뉴얼 - 페이지 17
{카테고리_이름} Cisco Firepower 4120에 대한 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Cisco Firepower 4120 26 페이지. Rack-mount and ground the chassis
Cisco Firepower 4120에 대해서도 마찬가지입니다: 유지 관리 및 업그레이드 매뉴얼 (20 페이지), 매뉴얼 (36 페이지), 매뉴얼 (8 페이지), 매뉴얼 (42 페이지), 시작하기 (42 페이지)
Installation, Maintenance, and Upgrade
Figure 7: Remove the M5 Screws
Step 7
For easier cable management, insert the negative lead cable first. Replace the grounding lug with the cable in the
following order—wire terminal, then the screw with the captive washer.
Figure 8: Insert the Cables
Step 8
Tighten the M5 screw with the captive washer to the recommended torque of 5 in-lbs for the positive stud and wire.
Secure the wires coming in from the terminal block so that they cannot be disturbed by casual contact.
Connect the DC Power Supply Module
Installation, Maintenance, and Upgrade
17