Cisco ONS 15454 포장 풀기 및 설치

{카테고리_이름} Cisco ONS 15454에 대한 포장 풀기 및 설치을 온라인으로 검색하거나 PDF를 다운로드하세요. Cisco ONS 15454 40 페이지. Four-shelf and zero-shelf bay assembly
Cisco ONS 15454에 대해서도 마찬가지입니다: 설치 지침 매뉴얼 (22 페이지), 설치 (32 페이지), 설치 (32 페이지), 포장 풀기 및 설치 (42 페이지)

Cisco ONS 15454 포장 풀기 및 설치
Unpacking and Installing the Cisco ONS 15454
Four-Shelf and Zero-Shelf Bay Assembly
Cisco ONS 15454 Four-Shelf and Zero-Shelf Bay Assembly
Overview
The Cisco ONS 15454 four-shelf and zero-shelf bay assemblies provide a dual-feed, pre-wired TPA-type
fuse and alarm panel, two vertical fiber ducts, and two 2.38-inch vertical extenders and extender bases.
The four-shelf bay assembly also provides a pre-installed, four-shelf configuration that includes four
ONS 15454 shelf assemblies with electrical interface assembly (EIA) panels or EIA blank cover panels.
This guide describes how to unpack and install the Cisco ONS 15454 four-shelf and zero-shelf bay
assembly. Because it is a complete system, installation simply requires you to remove the unit from the
shipping pallet, move the unit into place, secure it, and supply power and ground attachment. Refer to
the Cisco ONS 15454 user documentation for component-specific installation and replacement
procedures.
This guide includes the following sections:
Corporate Headquarters:
Cisco Systems, Inc., 170 West Tasman Drive, San Jose, CA 95134-1706 USA
Copyright © 2004 Cisco Systems, Inc. All rights reserved.
Figure 1 on page 2
Safety Recommendations
Included Material
Recommended Material
Unpacking Instructions
Installation Instructions
Slab Floor Plan
Raised Floor Plan
Install the ONS 15454 Four-Shelf or Zero-Shelf Bay Assembly
Route Fiber Through the Base
Cabling Illustrations
Fuse and Alarm Panel Wiring
FAP Alarming
FAP Output and Input Power
shows a four-shelf bay assembly.