Cisco SCE 1000 and 빠른 시작 매뉴얼 - 페이지 4
{카테고리_이름} Cisco SCE 1000 and에 대한 빠른 시작 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Cisco SCE 1000 and 49 페이지. Service control engine 1000 2xgbe
![Cisco SCE 1000 and 빠른 시작 매뉴얼](/uploads/products/server2/589090/589090.jpg)
2
Rack-Mount the SCE 1000
This section provides information for rack-mounting the SCE 1000 platform.
• SCE 1000 Mounting Brackets, page 4
• Attach the Brackets to the SCE 1000, page 5
• Installing the Crossrail Supports (Four-post rack only), page 6
• Mount the System to the Rack, page 7
SCE 1000 Mounting Brackets
There are two standard types of equipment racks, and the appropriate brackets for each are provided in the enclosed kit.
• 19" rack with front rack posts — the mounting kit includes two mounting brackets as illustrated below:
Figure 2
Mounting Bracket for 2-post Racks
• 19" rack with front and back rack posts — in addition to the mounting brackets illustrated below, the mounting kit includes
two crossrail supports that the unit slides onto.
Figure 3
Mounting Bracket for 4-post Racks
The SCE 1000 mounts to the two front rack posts with brackets that attach to the front of the SCE 1000. The inside width
between the two posts or mounting strips (left and right) must be at least 17.3 inches (44 cm).
Remember to leave a two-inch (5 cm) clearance on both sides of the SCE 1000 and at the rear for adequate airflow for
Note
the inlet and exhaust vents.
4