Cisco SCE8000 GBE 제거 및 교체 절차 - 페이지 16
{카테고리_이름} Cisco SCE8000 GBE에 대한 제거 및 교체 절차을 온라인으로 검색하거나 PDF를 다운로드하세요. Cisco SCE8000 GBE 36 페이지. 10gbe platform
Cisco SCE8000 GBE에 대해서도 마찬가지입니다: 빠른 시작 매뉴얼 (25 페이지), 구성 매뉴얼 (18 페이지), 설치 (21 페이지)
Installing a Module
Always handle the SIP by the carrier edges and handle; never touch the SIP components or connector
pins. (See
When a slot is not in use, a blank filler plate must be installed in the empty slot to allow the SCE platform
to conform to electromagnetic interference (EMI) emissions requirements and to allow proper airflow
across the installed modules. If you plan to install a SIP in a slot that is not in use, you must first remove
the blank filler plate.
Figure 9-9
Installing a Module
Perform the following procedure to install a module:
Choose a slot for the module.
Step 1
Modules must be installed in the proper slots, as follows:
•
•
•
At the SCE# prompt, enter reload shutdown and press Enter to power down the Cisco SCE 8000
Step 2
platform before installing or removing any module.
Step 3
Make sure that there is enough clearance to accommodate any interface equipment that you connect
directly to the module ports.
Step 4
Verify that the captive installation screws are tightened on all modules already installed in the chassis.
This ensures that the EMI gaskets on all modules are fully compressed to maximize the opening space
for the new or replacement module.
Cisco SCE8000 10GBE Installation and Configuration Guide
9-16
Figure
9-9.)
Handling a SIP
Printed circuit board
Metal carrier
GND
A single Cisco SCE 8000-SCM-E module must be installed in slot 1.
If a second Cisco SCE 8000-SCM-E module is used, it must be installed in slot 2.
The Cisco SCE 8000-SIP module must be installed in slot 3.
Chapter 9 Removal and Replacement Procedures
OL-26784-02