Cisco RF Gateway 10 빠른 시작 매뉴얼 - 페이지 24
{카테고리_이름} Cisco RF Gateway 10에 대한 빠른 시작 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Cisco RF Gateway 10 41 페이지. Cisco systems rf gateway quick start guide
Figure 17
Aligning the UCH with the RF switch card Dense Connector Ports
Red line
Figure 18
Installing the UCH on the Faceplate
Repeat steps 1 through 4 for the remaining 11 UCH to RF switch card interconnects.
Step 5
Note
The RF switch cards connect orthogonally across all Universal RF line cards in the system picking up one connector off
each card. It is required to install all the 12 UCH to all the 12 RF switch cards so that the coaxial cables can be
connected even if only one RF line card is installed in the system.
Installing or Replacing the Cables in the UCH2
This section describes how to install and replace the UCH2 cables. The UCH2 universal cable holders must be used with the
Cisco RFGW-10 RF switch line cards. The UCH is designed to stabilize the cables and hold them in place.
24
Cutout
Shroud
Lead screw