Argos 345/1247 조립 지침 매뉴얼 - 페이지 8

{카테고리_이름} Argos 345/1247에 대한 조립 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Argos 345/1247 8 페이지. Built in

Assembly Instructions
Step 3
The mortar should set enough after
24 hours (depending on
temperature and weather
conditions).
Once set, place the ash tray
the grill support
5
and 8th layer of bricks, then set the
charcoal grill
on the central flat
3
surface of the ash tray
Please refer to diagram for correct
alignment. The cooking grill
may be placed on either of the two
upper sets of grill supports
using the grill handles
Be sure to position the grill handles
evenly along the length of the
cooking grill for safety.
Step 4
Assembly is complete.
If you need help or have damaged or missing parts, call the
03450 778888 (Homebase).
7
4
on
between 7th
4 .
1
by
5
2 .
2
1
3
4
12
11
10
9
8
7
6
5
4
3
2
1
Customer Helpline: 03456 400800(Argos)/
2