AEONS Technologies SP 06 Series 소유자 매뉴얼 - 페이지 6
{카테고리_이름} AEONS Technologies SP 06 Series에 대한 소유자 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. AEONS Technologies SP 06 Series 12 페이지. Wall-mounted enclosure
Step 3
: Install Vertical Mounting Rails
Install the 4 Vertical Rack Rails (#8) to
the horizontal rails at the desired depth
using the M5 self-tapping screws
provided. When determining the
appropriate depth, make sure consider
the equipment that you plan to mount
inside the enclosure, and the rail depth
is the same on both sides of the cabinet.
Step 4
: Install L Type Mounting Bracket
Mount L Brackets (#5) to the Vertical
Mounting Rails on each side of the
cabinet using the Cage Nut Kit provided.
Note: To mount the L Type Mounting
Brackets (#5), the depth between front
and back vertical rails should be 11''
(280mm) for 450mm depth cabinet and
16.9'' (430mm) for 600mm depth
cabinet.)
5