Ariston 47-116-33 사용자 설명서, 설치 및 서비스 지침 - 페이지 19

{카테고리_이름} Ariston 47-116-33에 대한 사용자 설명서, 설치 및 서비스 지침을 온라인으로 검색하거나 PDF를 다운로드하세요. Ariston 47-116-33 50 페이지.

Installation
6.10

Control Panel

K J
I H G
F
C
A
B
L
:
EGEND
A - On/Off button
B - Central heating temperature adjustment
C - Domestic hot water temperature adjustment
D - Heating system pressure gauge
E - Time clock (knock out)
F - Central heating selector
G - Central heating L.E.D. (green)
H - Flue sensor L.E.D. (yellow)
I - Ignition failure (lockout) and/or overheat reset button
J - Overheat and/or ignition failure (lockout) L.E.D. (red)
)
K - ON/OFF L.E.D. (green
6.11
Removing the Front Panel
In order to access the inside of the boiler, it is necessary to
unscrew the fastening screws "A" of the control panel located on
the lower part of the panel itself.
The control panel moves downward and when pulled forward
rotates on two lateral hinges.
The panel stays in a semi-horizontal position, which allows
access to the inner parts of the boiler.
In order to increase the manoeuvering space, it is possible to
raise the control panel and rotate it to a fully horizontal position.
1
Supplied By www.heating spares.co Tel. 0161 620 6677
E
D
A
2
To dismantle the front casing panel it is necessary to:
1 - Remove the two screws "B";
2 - Move the front casing panel up and lift forward.
3
4
19
B