Ariston 500 STD ProTech 설치, 서비스 및 운영 지침 - 페이지 32

{카테고리_이름} Ariston 500 STD ProTech에 대한 설치, 서비스 및 운영 지침을 온라인으로 검색하거나 PDF를 다운로드하세요. Ariston 500 STD ProTech 34 페이지. Unvented hot water storage cylinders

5.
BENCHMARK COMMISSIONING CHECKLIST
I M A I N S P R E S S U R E H O T W A T E R S T O R A G E S Y S T E M C O M M I S S I O N I N G C H E C K L I S T
This Commissioning Checklist is to be completed in full by the competent person who commissioned the boiler as a means of demonstrating
compliance with the appropriate Building Regulations and then handed to the customer to keep for future reference.
^
Failure to install and commission this equipment to the manufacturer's instructions may invalidate the warranty but does not affect statutory rights.
Customer Name
Telephone Number
Boiler Make ar^d Model
Boiler Serial Number I I I 1 I 1 I I 1 1 I I I I I I 1 I I I ! I I 1 1 I I I I I I I I I I 1 I I I I
Commissioned by print rtame)
CORGI ID Number
^
Company Name
^
Telephone Number
Company Address
:
Commissioning Date
To be completed by the customer on receipt of a Building Regulations Compliance Certificate*:
Building Regulations Notification Number (if applicable)
.
ALL SYSTEMS PRIMARY SETTINGS (indirect heating only)
is the primary circuit a sealed or open vented system?
What Is the maximum primary flow temperature?
ALL SYSTEMS
What is the incoming static cold water pressure at the inlet to the system?
Has a strainer been cleaned of Installation debris (if fitted)?
Yes
J
Is the installation in a hard water area (above 200ppm)?
Yes
If yes, has a water scale reducer been fitted?
Yes
What type of scale reducer has been fitted?
Time and temperature controls have been fitted in compliance with Part L of the Building Regulations?
Type of control system (if applicable)
Is the cylinder solar (or other renewable) compatible?
What is the hot water temperature at the nearest outlet?
^
What is the pressure reducing valve setting?
Has a combined temperature and pressure relief valve and expansion valve been fitted and discharge tested?
The tundish and discharge pipework have been connected and terminated to Part G of the Building Regulations
Are all energy sources fitted with a cut out device?
^
Has the expansion vessel or internal air space been checked?
THERMAL STORES ONLY
What store temperature is achievable?
What is the maximum hot water temperature?
ALL INSTALLATIONS
>3 The hot water system complies with the appropriate Building Regulations
The system has been installed and commissioned in accordance with the manufacturer's instructions
The system controls have t>een demonstrated to and understood by the customer
The manufacturer's literature, including Benchmark Checklist and Service Record, has been explained and left with the customer
Commissioning Engineer's Signature
Customer's Signature
(To contirm salisractory demonstration and racaipt o! manufacturer^ literature)
*AI1 InstailaUons In Ensland and V^tes must be notified to Local Authority Building Control (LABC) ^her directly or through a Competent Persons Scheme.
A BuiKfing Bssulatlona Compliance Certincate will then be issued to the customer.
.
benchmark
GHeating and Hotwater Industry Council (HHIC)
vwvw.centridheatlng.co.uk