This Commissioning Checklist is to be completed in full by the competent person who commissioned the heat pump and associated equipment as a means of
demonstrating compliance with the appropriate Building Regulations and then handed to the customer to keep for future reference.
Failure to install and commission this equipment to the manufacturer's instructions may invalidate the warranty but does not affect statutory rights.
Customer Name
Address
Heat Pump Make and Model
Heat Pump Serial Number
Commissioned by (print name)
Company Name & Address
Building Regulations Notifi cation Number (if applicable)
ALL SYSTEMS
What is the incoming static cold water pressure at the inlet to the system?
Has a strainer been cleaned of installation debris (if fi tted)?
Is the installation in a hard water area (above 200ppm)?
If yes, has a water scale reducer been fi tted?
What type of scale reducer has been fi tted?
What is the hot water thermostat set temperature?
What is the maximum hot water fl ow rate at set thermostat temperature (measured at high fl ow outlet)?
Time and temperature controls have been fi tted in compliance with Part L of the Building Regulations?
Type of control system (if applicable)
Is the cylinder solar (or other renewable) compatible?
What is the hot water temperature at the nearest outlet?
All appropriate pipes have been insultated up to 1 metre or the point where they become concealed
UNVENTED SYSTEMS ONLY
Where is the pressure reducing valve situated (if fi tted)?
What is the pressure reducing valve setting?
Has a combined temperature and pressure relief valve and expansion valve been fi tted and discharge tested?
The tundish and discharge pipework have been connected and terminated to Part G of the Building Regulations
Are all energy sources fi tted with a cut out device?
Has the expansion vessel or internal air space been checked?
CENTRAL HEATING MODE
Heating Flow Temperature
DOMESTIC HOT WATER MODE
Is the heat pump connected to a hot water cylinder?
Hot water has been checked at all outlets
ADDITIONAL SYSTEM INFORMATON
Additional heat sources connected:
ALL INSTALLATIONS
Hot water and ventilation systems comply with the appropriate Building Regulations
All electrical work complies with the appropriate Regulations
The heat pump and associated products have been installed and commissioned in accordance with the manufacturer's instructions
The operation of the heat pump has been demonstrated to the customer
The manufacturer's literature, including Benchmark Checklist and Service Record, has been explained and left with the customer
Commissioning Engineer's Signature
Customer's Signature
(To confi rm demonstration of equipment and receipt of appliance instructions)
42
Notes: [1] Installers should be members of an appropriate Competent Persons Scheme. [2] All installations in England and Wales must be
notifi ed to Local Area Building Control (LABC) either directly or through a Competent Persons Scheme. A Building Regulations Compliance
Certifi cate will then be issued to the customer. [3] May be required for systems covered by G3 Regulations
© Heating and Hotwater Industry Council (HHIC)
EXTERNAL AIR SOURCE HEAT PUMP WATER HEATER
[2]
°C
Heating Return Temperature
Measure and Record
Unvented
Yes
Have Thermostatic Blending Valves been fi tted?
Gas Boiler
Oil Boiler
EXHAUST AIR HEAT PUMP WATER HEATER
Telephone Number
Certifi ed Operative Reg. No.
Commissioning Date
Telephone No.
°C
Vented
Thermal Store
Electric Heater
Solar Thermal
[1]
Yes
Yes
Yes
Y Plan
S Plan
Yes
Yes
Yes
Yes
Not Connected
Yes
Other
Yes
Yes
Yes
Yes
Yes
www.centralheating.co.uk
bar
No
No
No
°C
I/min
Yes
Other
No
°C
Yes
bar
No
Yes
No
No
Not required