Ariston 41-116-06 설치 지침 매뉴얼 - 페이지 28

{카테고리_이름} Ariston 41-116-06에 대한 설치 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Ariston 41-116-06 48 페이지. Microsystem

1.2.2 Removing the sealed chamber front cover
1. Remove the screws "C" (F
2. Lift the sealed chamber front cover from the locating pins
(F
. 1.7).
IG
4
. 1.6);
IG
C
C
F
IG
F
IG

1.2.3 Removing the side panels

1. Remove the four screws "D" for each side panel (F
2. Pull the panel away from the boiler at the base, then lift the
panel up and remove from the boiler.
F
. 1.6
. 1.7
. 1.8
IG
D
.1.8);
IG
D
D