Dini Argeo HLD150 운영 매뉴얼 - 페이지 4
{카테고리_이름} Dini Argeo HLD150에 대한 운영 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Dini Argeo HLD150 13 페이지. Laboratory scale, industrial weighing systems
3. INSTALLATION
a) Unpack then product.
b) If present (depending on the model), it is necessary to unscrew and remove the locking screw for the transportation
placed under the scale, as shown in the figure below:
c) Level the platform by adjusting the adjustable feet until the bubble is in the centre of the level. The stability of the
platform is very important.
ALL THE CORNERS MUST REST IN A UNIFORM WAY. Carefully check that all feet fully rest on the ground and that the
platform, loaded on the corner, is not unstable (if a corner is not resting on the ground its relative foot is easier to turn).
3.1 POWER SUPPLY AND START-UP
The indicator can be powered with a fitted 240 Vac external power adapter or just with the fitted battery.
NOTE: it is advisable to completely recharge the battery (12 hours) with the first installation of the instrument.
TO POWER the instrument through the 240 Vac mains put the AC/DC power plug in the appropriate socket under the
scale and the power adapter in the 240 Vac mains socket.
TO TURN ON/TURN OFF the instrument press the ON/OFF key.
3.2 BATTERY POWERED
The weighing indicator can be operated from the battery if desired.
When the battery needs charging the
symbol on the weight display will be empty. The battery should be charged
when the symbol is on. The scale will still operate for about 10 minutes after which it will automatically switch off to protect
the battery.
To charge the battery simply plug into the mains power. The scale does not need to be turned on.
The battery should be charged for 12 hours for full capacity.
You can find the
symbol on the display to indicate the status of battery charging. When the scale is plugged into
5