Ariston MICROCOMBI 23 MFFI 설치 지침 매뉴얼 - 페이지 21

{카테고리_이름} Ariston MICROCOMBI 23 MFFI에 대한 설치 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Ariston MICROCOMBI 23 MFFI 25 페이지. Wall-hung electronic ignition gas combination boiler ariston microcombi 23 mffi/ microcombi 27 mffi
Ariston MICROCOMBI 23 MFFI에 대해서도 마찬가지입니다: 사용자 설명서 (20 페이지), 서비스 지침 (28 페이지), 최종 사용자 설명서 (8 페이지), 매뉴얼 (4 페이지)

Ariston MICROCOMBI 23 MFFI 설치 지침 매뉴얼
5.
MAINTENANCE
It is recommended that the following inspections be carried out on the
boiler at least once a year:
1 - Check the seals for the water connections; replace any faulty seals.
2 - Check the gas seals; replace any faulty gas seals.
3 - Visual check of the entire unit.
4 - Visual check of the combustion process or analysis of combustion by-
products (see section 3.6) and cleaning of the burner if needed.
5 - If called for by point. 3, dismantling and cleaning of the combustion
chamber.
6 - If called for by point. 4, dismantling and cleaning of the burner jets.
7 - Visual check of the primary heat exchanger:
-
check for overheating in the blade assembly;
-
clean the exhaust fan if needed.
8 - Adjustment of the flow rate of the gas: flow rate for lighting, partial load
and full load.
9 - Check of the heating safety systems:
-
safety device for maximum temperature (overheat thermostat);
-
safety device for maximum pressure (safety valve).
10- Check of the gas safety systems:
-
safety device for lack of gas or flame ionisation (detection
electrode);
-
safety device for gas cock.
11- Check of the electrical connection (make sure it complies with the
instructions in the manual).
12- Check of domestic hot water production efficiency (flow rate and
temperature)
13- General check of the combustion by-products of the
discharge/ventilation system.
14- Check of the general performance of the unit.
21