Ariston Type C 설치 지침 매뉴얼 - 페이지 21
{카테고리_이름} Ariston Type C에 대한 설치 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Ariston Type C 25 페이지. Type c boilers
Ariston Type C에 대해서도 마찬가지입니다: 설치 지침 매뉴얼 (25 페이지), 설치 지침 매뉴얼 (48 페이지), 설치 및 서비스 지침 (49 페이지), 설치 지침 매뉴얼 (44 페이지)
5.
MAINTENANCE
It is recommended that the following inspections be carried out on the
boiler at least once a year:
1 - Check the seals for the water connections; replace any faulty seals.
2 - Check the gas seals; replace any faulty gas seals.
3 - Visual check of the entire unit.
4 - Visual check of the combustion process or analysis of combustion by-
products (see section 3.6) and cleaning of the burner if needed.
5 - If called for by point. 3, dismantling and cleaning of the combustion
chamber.
6 - If called for by point. 4, dismantling and cleaning of the burner jets.
7 - Visual check of the primary heat exchanger:
-
check for overheating in the blade assembly;
-
clean the exhaust fan if needed.
8 - Adjustment of the flow rate of the gas: flow rate for lighting, partial load
and full load.
9 - Check of the heating safety systems:
-
safety device for maximum temperature (overheat thermostat);
-
safety device for maximum pressure (safety valve).
10- Check of the gas safety systems:
-
safety device for lack of gas or flame ionisation (detection
electrode);
-
safety device for gas cock.
11- Check of the electrical connection (make sure it complies with the
instructions in the manual).
12- Check of domestic hot water production efficiency (flow rate and
temperature)
13- General check of the combustion by-products of the
discharge/ventilation system.
14- Check of the general performance of the unit.
21