3Com 3C35420 설치 매뉴얼 - 페이지 2

{카테고리_이름} 3Com 3C35420에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. 3Com 3C35420 8 페이지.

2
FDDI M
I
ODULE
NSTALLATION
Status LEDs
Status
LED
Module
PWR
Status
INS
ERR
Port Status
L
E
T
DAS Status
G
UIDE
Each DAS connection consists of both an A port and a B port. Table 1
shows the DAS connections that you can configure and the associated
ports for each connection.
Table 1 DAS Connections
DAS
Connection
Port A
1
A1
2
A2
3
A3
For a description of how to configure these modules into your network,
see the CoreBuilder 3500 Getting Started Guide.
The modules contain one PWR (Power) LED, one INS (Board Inserted)
LED, and one ERR (Error) LED. Each port has one L (Link Status) LED, one
E (Error) LED, and one T (Traffic) LED. Each possible DAS connection has
one DAS LED between Port A and Port B, which indicates DAS status. This
table describes the LEDs:
Name
Color
Power
Green
Board
Yellow
Inserted
Board Error
Yellow
Blinking
Yellow
Link
Green
Blinking
Green
Error
Blinking
Yellow
Traffic
Blinking
Green
DAS
Green
Configured
Port B
B4
B5
B6
Description
The module is receiving power.
The module is partially inserted.
The module did not successfully complete the power-up
diagnostics.
A hardware/software incompatibility has occurred.
A valid link has been established and the port is active.
The port is part of a dual-homed DAS connection in standby
mode.
Indicates one or both of the following:
The port has failed link diagnostics and an error condition
has occurred.
Noise Threshold Event error has occurred due to excessive
noise.
The port is receiving or transmitting data.
The associated ports (directly above and below the LED) are
configured in DAS mode.