Whirlpool Duet GGW9250SU0 사용 및 관리 매뉴얼 - 페이지 12

{카테고리_이름} Whirlpool Duet GGW9250SU0에 대한 사용 및 관리 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Whirlpool Duet GGW9250SU0 48 페이지. Electronic gas dryer

Vent system
chart
NOTE: Side and bottom exhaust installations have a 90 ° turn
inside the dryer. To determine maximum exhaust length, add one
90 ° turn to the chart,
Number of
Type of
Box or
Angled
90 ° turns
vent
Iouvered
hoods
or elbows
hoods
0
Rigid metal
64 ft (20 m)
58 ft (17.7 m)
Flexible metal
36 ft (11 m)
28 ft (8,5 m)
1
Rigid metal
54 ft (16.5 m)
48 ft (14.6 m)
Flexible metal
31 ft (9.4 m)
23 ft (7 m)
2
Rigid metal
44 ft (13.4 m)
38 ft (11.6 m)
Flexible metal
27 ft (8.2 m)
19 ft (5.8 m)
3
Rigid metal
35 ft (10.7 m)
29 ft (8.8 m)
Flexible metal
25 ft (7.6 m)
17 ft (5.2 m)
4
Rigid metal
27 ft (8.2 m)
21 ft (6.4 m)
Flexible metal
23 ft (7 m)
15 ft (4.6 m)
1. Install exhaust hood. Use caulking compound to seal exterior
wall opening around exhaust hood.
2. Connect vent to exhaust hood. Vent must fit inside exhaust
hood. Secure vent to exhaust hood with 4" (10.2 cm) clamp.
3. Run vent to dryer location. Use the straightest path possible.
See "Determine vent path" in "Plan Vent System." Avoid 90 °
turns. Use clamps to seal all joints. Do not use duct tape,
screws or other fastening devices that extend into the interior
of the vent to secure vent.
3. Examine the leveling legs. Find the diamond marking,
4. Screw the legs into the leg holes by hand. Use a wrench to
finish turning the legs until the diamond marking is no longer
visible.
5. Place a carton corner post from dryer packaging under each
of the 2 dryer back corners. Stand the dryer up. Slide the
dryer on the corner posts until it is close to its final location.
Leave enough room to connect the exhaust vent or gas line.
For mobile home use
Gas dryers must be securely fastened to the floor at the time of
installation.
Mobile home installations require a Mobile Home Installation Kit.
For more information, please reference the service numbers in
the "Assistance
or Service" section of this manual.
Check the levelness of the dryer. Check levelness first
side to side, then front to back.
1. To protect the floor, use a large flat piece of cardboard from
the dryer carton. Place cardboard under the entire back edge
of the dryer.
2. Firmly grasp the body of the dryer. Gently lay the dryer on the
cardboard. See illustration.
\\
\\\
\\
\\\
\
If the dryer is not level, prop up the dryer using a wood block.
Use a wrench to adjust the legs up or down and check again for
levelness.
1=
2.
Remove the red cap from the gas pipe.
Using a wrench to tighten, connect the gas supply to the
dryer. Use pipe-joint
compound on the threads of all non-
flared male fittings. If flexible metal tubing is used, be sure
there are no kinks.
A
.....................................
A. Flared male fitting
B. Non-flared male fitting
NOTE: For LP gas connections,
you must use pipe-joint
compound
resistant to the action of LP gas. Do not use
TEFLON _*tape.
1-®TEFLON is a registered
trademark of E.I. Du Pont De Nemours and Company.
12