CalderaSpas Niagara 사전 배송 지침 - 페이지 13

{카테고리_이름} CalderaSpas Niagara에 대한 사전 배송 지침을 온라인으로 검색하거나 PDF를 다운로드하세요. CalderaSpas Niagara 16 페이지.

CalderaSpas Niagara 사전 배송 지침
FOR CONTROL BOX TERMINAL BLOCK
Wire Installation Steps
Refer to spa's wiring
diagram on back of Control
Box Cover for proper wiring
and jumper configuration!
WIRE INSTALLATION
1/2"
Strip wire
insulation back
½"
Entire stripped
end of wire
must be inside
Terminal
Block
Insert
screwdriver to
engage cage
clamp
Install
Stripped end
of wire into
Terminal
Block
After step 6,
pull on wire to
ensure proper
installation
Push top of
screwdriver away
from wire
Terminal Block
Remove
screwdriver
Page 13