ErgoCentric upCentric Power & Data Rail 매뉴얼 - 페이지 9

{카테고리_이름} ErgoCentric upCentric Power & Data Rail에 대한 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. ErgoCentric upCentric Power & Data Rail 19 페이지.

Installation Guide
upCentric Power & Data Rail
Assemble the Power & Data Rail Systems
Step 3: Assemble the first rail - "Power Infeed Rail"
a) Hook both ends of the first rail to your power infeed leg and to the
next leg in the layout .
b) Attach rail to legs with pan head screws (R).
Note: When building a single rail system and the second leg is an
End Leg, proceed to step 7 .
upCentric Power & Data Rail | Installation Guide
Note: If building a multi beam system,
refer to your floorplan layout, and
identify the power infeed rail .
WPI
or
CPI
9