Acond Hydromodul PRO-R SP 설치 매뉴얼 - 페이지 13
{카테고리_이름} Acond Hydromodul PRO-R SP에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Acond Hydromodul PRO-R SP 17 페이지.
7.5 Electrical wiring and commissioning
It is electrically connected using the diagrams supplied with this manual. The electrical wiring
procedure is as follows:
1. Switch off the heat pump circuit breaker in the home switchboard.
2. By measuring the power cables, make sure that they are really disconnected from the
electrical.
3. Remove the front cover
a. Unscrew the two screws accessible from the bottom of the Hydromodule, see the
following figure.
b. Remove the lid by moving it up and then towards you.
4. Remove the control cabinet cover using four screws accessible from the front of the
Hydromodule, see the following picture.
5. Connect the cables to the terminal board, see the following picture according to the
attached diagrams.
Installation manual
Hydromodul
12