Acond Hydromodul PRO-R SP 설치 매뉴얼 - 페이지 9
{카테고리_이름} Acond Hydromodul PRO-R SP에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Acond Hydromodul PRO-R SP 17 페이지.
Hydromodul
6.1.1 Electrical preparation
The electrical connection is made from the bottom side, where leave a free cable length of at
least 2m. The cables to be brought in are given by the diagrams annexed to this document.
6.2 Indoor room unit
The indoor C-ID room unit shall be placed in a heated reference room. The heating rod will be
switched if the temperature in the reference room unit drops below the set temperature in the
AcondTherm regulation.
A thermostatic valve shall not be placed in the reference room.
7 Installation
When installing, follow the order as shown below.
7.1 Mounting of the attached assembly
Attach the included assembly with pliers above the Hydromodule covers, see the following
picture. Use the seal correctly.
Installation manual
8