aerauliqa QR400MBP 설치 매뉴얼 - 페이지 5

{카테고리_이름} aerauliqa QR400MBP에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. aerauliqa QR400MBP 16 페이지. Heat recovery ventilation unit

aerauliqa QR400MBP 설치 매뉴얼
Fig. 5.c
Fig. 5.e
Fig. 5.g
Fig. 5.h
5.a Prepare the surface where the unit is to be mounted. Make sure that the surface is flat, leveled and that it supports the weight of the unit. Perform the
installation in accordance with local rules and regulations.
5.b Drill the holes in the wall
5.d.e Hang the unit to the wall by means of the fixing brackets and screw safely (screws and wall plugs not supplied)
5.f Make sure that the unit is at spirit level.
H=min. 60mm
Ø125mm
Ø125mm
Fig. 5.d
SPIRIT LEVEL
Fig. 5.f
Fig. 5.i
5