CalGym CG-7505 소유자 매뉴얼 - 페이지 8
{카테고리_이름} CalGym CG-7505에 대한 소유자 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. CalGym CG-7505 20 페이지. Pectoral contractor maintenance & assembly instructions
Registration, Service & Assembly
Thank you for purchasing the CALGYM CG-7505 Pectoral Contractor. This machine is part of the Tuff Stuff line of quality strength training
equipment. To maximize your use of the equipment, please study the Owner's Manual thoroughly.
Registration
To avoid unnecessary delays on warranty parts and to insure that a
permanent record of your purchase is on fi le with our company, be
sure to register online at www.tuff stuffi tness.com within 10 days
of purchase.
Obtaining Service
Please use this Owner's Manual as your guide to all parts included in
your shipment. When ordering parts, you must specify the part number
and description from this manual. Use only genuine Tuff Stuff
replacement parts when servicing the equipment. Failure to do
so will void warranty and could result in serious injury or death.
For information about product operation or service:
Phone:
909-629-1600 Toll Free 888-884-8275
Fax:
909-629-4967
E-mail:
service@tuff stuff .net or service1@tuff stuff .net
Hours:
M–F 8:00 – 4:30 PST
Or write to:
Tuff Stuff Fitness Equipment Inc.
Customer Service
13971 Norton Avenue, Chino, CA 91710
Retain this Owner's Manual for future reference when ordering
service or parts. To assist you better, please be prepared to
provide the following information:
1. Model Number
3. Serial Number
Required Tools
The basic tools that you will need to assemble the CG-7505 but are not
limited to:
• 9/16" , 3/4", 1/2" combination wrenches
• Adjustable wrench
• Ratchet wrench with 9/16" , 3/4", 1/2" sockets
• Rubber mallet, measuring tape & utility knife
• Super Lube® spray lubricant and grease
• Windex or household glass cleaner
Assembly Requirements
Follow these installation requirements when assemblying the CG-7505.
Use the overhead view on the Content Page to layout your fl oor plan
before assemblying.
Set up the CG-7505 on a clean, solid, fl at surface. A smooth, fl at surface
under the machine helps keep it level.
8
2. Place of Purchase
4. Part # and Description
BY TUFFSTUFF FITNESS
Allow ample space around the machine for safe unrestricted use an-
d easier access.
Insert all bolts in the same direction. For aesthetic appearance, insert all
bolts in the same direction unless specifi ed (in text or illustration) to do
otherwise.
Leave room for adjustments. Do not fully tighten fasteners until in-
structed in the assembly steps to do so (to prevent any diffi culty with
alignment of parts during the assembly process). When not instructed,
tighten fasteners such as bolts, nuts and screws so the unit is stable, but
leave room for adjustments.
Assembly Tips
Read all "Notes" on each page before beginning each step.
While you may be able to assemble the CG-7505 using the illustrations
only, IMPORTANT safety notes and other tips are included in the text.
Some pieces may have extra holes that you will not use. Use only those
holes indicated in the instructions and illustration.
NOTE:
With so many assembled parts, proper alignment and
adjustment is critical. While tightening the nuts and bolts,
be sure to leave room for fi nal adjustments.
CAUTION: Obtain assistance from Tuff Stuff if you have diffi culty
assemblying the CG-7505. Please do not attempt to complete
the assembly as this could result in equipment failure and
serious injuries to the users.
Symbols & Description
Loosely Fasten
Finger tighten all hardware in this step. DO NOT wrench tighten.
Some component(s) may need pre-assembly and alignment during
the assembly process.
Fully Fasten
Wrench tighten all hardware in this step.
CG-7505 Pectoral Contractor