Ⅸ.Installation instructions
Installation instructions
1. Unit installation
1).Installation location
Host unit
²Should be installed in a larger & well-ventilated place.
²Installation location should ensure unhindered access outlet (inlet & outlet shown as
below).
²Install gutter or set up positions near the outfall, to facilitate the drainage.
²The installation base or bracket should be steady, to ensure the smooth operation of
running units.
²Make sure the unit is vertical after installation, and no incline.
²Make sure not to install the host unit in the any conditioner of pollution, corrosive gases,
sun and fallen leaves, etc.
²Installation location must not next to place of incendive , easy-explosion and fire .
²Installation must pay attention to the distance between the barriers shown in below
picture (pay attention to arrow direction).
Water tank
²Water tanks should be placed where ambient temperature is above 0℃ .
²Can be installed outdoors or the top of the building (based on the size of water tanks and
the load-bearing capacity of the building and so on).
²Do not install water tanks in the pollution, corrosive gases place.
2).Unit installation
²Units base can be installed as cement concrete structures, steel brackets can also be used,
add the shockproof rubber pads , make the base surface flat.
²Units can be designed based on the working performance.
(See table of technical performance parameters)
²Unit should have drain or drainage inlets.
²Normally required to install in the place where setted cement concrete base.
2000mm above the top
Air outlet
Air inlet
Heat pump
Above 1000mm
Air inlet
Above 1000mm
13
Water heater