aldes VEX 725T 조립 및 유지보수 매뉴얼 - 페이지 15
{카테고리_이름} aldes VEX 725T에 대한 조립 및 유지보수 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. aldes VEX 725T 20 페이지.
Maintenance Period
Every year:
- Check tension of the drive belt and be sure the belt is running properly (for units with rotary type heat exchanger)
- Paint the exterior surface of casing to prevent corrosion on metal surfaces of the unit.
- Clean fan propeller and fan shaft of the fan.
- If the unit has damper, check the connection of damper, set screw and rigging.
- Check all electrical connections and isolation.
- Check if there is any damaged cable connections.
- Check if there is any damaged on all gaskets around door and buffer. Check the situation of all isolation materials. Check all
connections to prevent fracture and leakage, and if there is any repair it.
Every 3-6 months:
- Check all electrical connections.
- Check the accumulated dirt on coils.
- If the unit has damper, clean damper and its components.
- Clean or change clogged or dirty fi lters.
15