Zanussi ZGL 62 IT 지침 책자 - 페이지 26
{카테고리_이름} Zanussi ZGL 62 IT에 대한 지침 책자을 온라인으로 검색하거나 PDF를 다운로드하세요. Zanussi ZGL 62 IT 32 페이지.
Commissioning
Commissioning
Commissioning
Commissioning
Commissioning
When the hob has been fully installed it will be necessary to check the
minimum flame setting. To do this, follow the procedure below.
! ! ! ! !
1) Turn the gas tap to the MAX position and ignite.
2) Set the gas tap to the MIN flame position then turn the control
knob from MIN to MAX several times. If the flame is unstable or is
extinguished follow the procedure below.
P r o c e d u r e :
P r o c e d u r e :
P r o c e d u r e :
P r o c e d u r e :
P r o c e d u r e :
! ! ! ! !
1) Re-ignite the burner and set
to MIN.
2) Remove the control knob.
3) To adjust, use a thin bladed
screwdriver and turn the
adjustment
diagram) until the flame is
steady
extinguish, when the knob is
turned from MIN to MAX.
Repeat this procedure for all
burners.
Pr Pr Pr Pr Pressur
essur
essur
essure T
e T
e Testing
e T
essur
e T
The pressure testing must be carried out on the burners.
! ! ! ! !
Proceed as follows:
1) Remove the pan supports and the burner caps and crowns.
2) Fit manometer tube over the injector.
3) Turn on the burner gas supply and ignite another burner supply.
The pressure reading should be nominally 20 mbar and must be
between 17 mbar and 25 mbar.
4) Turn off the burner supplies.
26
screw
and
does
esting
esting
esting
esting
(see
not
Minimum adjustment
Minimum adjustment
Minimum adjustment
Minimum adjustment
Minimum adjustment
s c r e w
s c r e w
s c r e w
s c r e w
s c r e w