Clarke SE16C150 운영 및 유지 관리 지침 - 페이지 4

{카테고리_이름} Clarke SE16C150에 대한 운영 및 유지 관리 지침을 온라인으로 검색하거나 PDF를 다운로드하세요. Clarke SE16C150 16 페이지. Air compressor electric motor driven
Clarke SE16C150에 대해서도 마찬가지입니다: 운영 및 유지보수 지침 매뉴얼 (17 페이지)

Clarke SE16C150 운영 및 유지 관리 지침

INSTALLATION

Before installing your machine, check that its air output is sufficient for the equipment
to be used. The air output from the compressor must be more than the volume of
air required. We recommend the following:
1.
Firm and level site, and the use of floor mountings for stationary compressors
- anti-vibration pads. (Do not bolt machines directly to the floor).
2.
Dust and damp free environment.
3.
Adequate ventilation for:-
a) Air intake to compressor pump (in order to draw in clean air).
b) Cooling to compressor pump, and electric motor.
4.
To allow sufficient access for servicing, a minimum clearance of 500mm must
be allowed around the machine.
5.
The power cable from the main supply must be large enough to carry the
starting and running load of the electric motor. This is particularly relevant if
the compressor is some distance from the source of supply.
6.
Electrical installations should be completed by a qualified electrician.
7.
Electrical connection to the mains supply must be via a suitably fused (see
table below) approved plug or isolator (allowing sufficient capacity for motor
starting). If using a circuit breaker, ensure it is motor rated and of sufficient size
to allow for motor starting.
8.
Compressors should be connected to mains electricity supply via an earth
leakage protection device (RCD).
MOTOR SIZE
KW
0.75
1.1
1.5
1.9
2.2
3.0
4.0
5.5
7.5
11.0
15.0

SUGGESTED FUSE RATINGS

SINGLE PHASE
HP
MOTOR D.O.L.
1.0
13 amp
1.5
13/15 amp
2.0
20 amp
2.5
20 amp
3.0
30 amp
4.0
40 amp
5.5
50 amp
7.5
10.0
15.0
20.0
THREE PHASE MOTORS 415V
D.O.L.
10 amp
10 amp
10 amp
16 amp
20 amp
25 amp
30 amp
4
STAR DELTA
25 amp
30 amp
35 amp