Acorn NEO-METRO SLAB-EDGE 3802 설치, 운영 및 유지보수 매뉴얼 - 페이지 9

{카테고리_이름} Acorn NEO-METRO SLAB-EDGE 3802에 대한 설치, 운영 및 유지보수 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Acorn NEO-METRO SLAB-EDGE 3802 18 페이지.

PUSH-IN FITTING INSTALLATION
NOTE: FITTINGS AND TUBE SHOULD BE KEPT
CLEAN, BAGGED AND UNDAMAGED PRIOR TO

INSTALLATION.

1. Cut to fit length of 1/4" PE tubing and remove any burrs
or sharp edges. Ensure that the outside diameter is free
from score marks. Tube ends should be square.
2. Firmly and fully insert the tubing end into the push-in
fitting up to the tube stop located approximately 1/2"
deep.
3. Pull on the fitted tubing to ensure it is secure. Tube
should not come free from the fitting. Water test the
connection assembly prior to leaving the site to ensure
there are no leaks.
4. To disconnect the tube from the fitting ensure that the
water line is depressurized. Push collet square towards
the push-in fitting body and hold. While holding the
collet in, pull on the PE tubing to remove from the push-
in fitting.
Part #: 6216-011-000
INSTALLATION, OPERATION
SPOUT INSTALLATION
1. Assemble spout to deck securing it with nut.
2. Connect 1/4" O.D. PE tubing from valve to Union
Push-In Connection.
Washer
Nut
Push-In
Connection
Ø1/4" OD
PE Tubing
1.
2.
COLLET
3.
4.
TOLL FREE 800-743-8259 • LOCAL 626-855-4866 • FAX 626-855-4863
Page 9 of 18
& MAINTENANCE MANUAL
O-RING
O-RING
TUBE STOP
COLLET
COLLET
COLLET
COLLET
NEO-METRO FIELD SERVICE
Revised A: 10/24/22