Acorn Safety S0950-RH 설치, 작동 및 유지보수 지침 - 페이지 2
{카테고리_이름} Acorn Safety S0950-RH에 대한 설치, 작동 및 유지보수 지침을 온라인으로 검색하거나 PDF를 다운로드하세요. Acorn Safety S0950-RH 5 페이지. Eye/facewash
Installation & Operation Manual
PRELIMINARY STEPS
1. Read the installation instructions prior to beginning the installation.
2. Separate parts from packaging and verify all necessary parts are accounted for and undamaged. Obtain missing or
damaged parts from Acorn Safety prior to beginning installation.
3. Flush water supply lines prior to installation. This will remove unwanted debris from the lines and prevent unwanted
blockages in the safety equipment.
4. In order to comply with ANSI Z358.1, the safety equipment must be inspected periodically. An inspection tag is
provided for documentation purposes.
5. all employees at risk of contamination should be informed and trained in the use of this and any other safety
equipment. The signage provided should be posted appropriately in close proximity to this equipment.
ROUGH-IN
6 1 8 "
(156)
13 3 4 "
(349)
4 1 2 "
(108)
NOTE:
1.
2.
BETWEEN 33" [385] AND 45" [1143] ABOVE
FLOOR.
3.
RIGHT HAND MODEL SHOWN. LEFT HAND
MODELS AVAILABLE.
Acorn Safety
a division of Acorn Engineering Company™
Manual #7109-402-001
3 5 8 "
(92)
90°
Ø2 1 4 "
(57)
1 7 8 "
(48)
1 1 2 "
(38)
ALL DIMENSIONS ARE IN INCHES [MM].
ANSI Z358.1 REQUIRES NOZZLES TO BE
3 9 16 "
(90)
1/2" NPT SUPPLY
Page 2 of 5
3
4 "
Ø 1 4 "
(19)
(6.4)
Ø1 1 8 "
(28.5)
MOUNTING DETAIL
Revised: 08/16/19