Acorn Safety S2310 설치, 작동 및 유지보수 지침 - 페이지 2

{카테고리_이름} Acorn Safety S2310에 대한 설치, 작동 및 유지보수 지침을 온라인으로 검색하거나 PDF를 다운로드하세요. Acorn Safety S2310 5 페이지. Combination stations

Installation & Operation Manual

PRELIMINARY STEPS

1. Read the installation instructions prior to beginning the installation.
2. Separate parts from packaging and verify all necessary parts are accounted for and undamaged. Obtain missing or
damaged parts from Acorn Safety prior to beginning installation.
3. Flush water supply lines prior to installation. This will remove unwanted debris from the lines and prevent unwanted
blockages in the safety equipment.
4. In order to comply with ANSI Z358.1, the safety equipment must be inspected periodically. An inspection tag is provided for
documentation purposes.
5. all employees at risk of contamination should be informed and trained in the use of this and any other safety equipment. The
signage provided should be posted appropriately in close proximity to this equipment.
ROUGH-IN
Ø 9 1 8 "
FLANGE MT'G
10 5 8 "
(270)
Acorn Safety
a division of Acorn Engineering Company™
Manual #7109-250-001
Ø 7 1 2 "
(191)
3
8 "
(10)
4X MT'G
HOLES
DETAIL
84 3 8 "
(2144)
65 3 8 "
(1659)
23 1 2 "
(595)
41 5 8 "
(1056)
31 5 8 "
(799)
Page 2 of 5
1 1 4 " NPT
SUPPLY PLUGGED
1 1 4 " NPT
SUPPLY
(2261)
62 5 8 "
10 1 4 "
(1591)
(260)
1 1 4 " NPT
WASTE
8"
(203)
Revised: 01/08/2013
89"