Acorn Safety S0340-FPB 설치, 작동 및 유지보수 지침 - 페이지 4

{카테고리_이름} Acorn Safety S0340-FPB에 대한 설치, 작동 및 유지보수 지침을 온라인으로 검색하거나 PDF를 다운로드하세요. Acorn Safety S0340-FPB 7 페이지. Pedestal eye/facewash

Installation & Operation Manual
INSTALLATION INSTRUCTIONS cont.:
Step Four: SANITARY DRAIN CONNECTION
Note: Refer to Rough-ins for supply and drain line locations.
1. Install necessary pipe fittings (supplied by others) to
make connection to 1-1/4" NPT waste tee with sanitary
drain line.
Step Five: TEST
1. Turn on water supply to 3/4" potable water supply.
2. Inspect system for leaks.
3. Operate push handles on hydrant to verify that eyewash
flows properly.
4. Shut off push handle and verify that the eyewash shuts off
properly.
Step Six: SIGNAGE AND INSPECTION TAG
1. Install sign (D) with clear visibility as shown with
appropriate hardware (supplied by others).
2. Attach inspection tag (E) supplied with plastic zip tie to
1/2" supply line as shown.
BACK FILL
AREA
Acorn Safety
a division of Acorn Engineering Company™
Manual #7109-214-001
11 1 2 "
[292]
1-1/4" NPT
WASTE
8"
[203]
WEEP
HOLES
VALVE
BODY
Page 4 of 7
3
" FREEZE RESISTANT
4
BURY VALVE
31 1 2 "
[800]
FROST LINE
POROUS GRAVEL
FILL (MIN. 3 CU FT.
BY OTHERS)
Date: 10/28/2013