Acorn Safety S0440 설치, 작동 및 유지보수 지침 - 페이지 2
{카테고리_이름} Acorn Safety S0440에 대한 설치, 작동 및 유지보수 지침을 온라인으로 검색하거나 PDF를 다운로드하세요. Acorn Safety S0440 5 페이지. Eyewash / facewash
Installation & Operation Manual
BEFORE INSTALLATION
1. Read the installation instructions prior to beginning the installation.
2. Separate parts from packaging and verify all necessary parts are accounted for and undamaged. Obtain missing or
damaged parts from Acorn Safety prior to beginning installation. See page 4.
3. Thoroughly rinse unit inside and outside with HOT soapy water (use mild soap & potable water). Ensure that no foreign
matter or particles are left inside unit especially in the sprayhead ports. Inspect for leaks.
4. In order to comply with ANSI Z358.1, the safety equipment must be inspected periodically. An inspection tag is provided for
documentation purposes.
5. All employees at risk of eye contamination should be informed and trained in the use of this and any other safety equipment.
ROUGH-IN
3
35
"
8
GENERAL NOTES:
1. ALL DIMENSIONS ARE IN INCHES
*2. DIMENSIONS SHOWN ARE FOR NORMAL ADULT HEIGHT. ANSI Z358. 1 REQUIRE NOZZLES TO BE
BETWEEN 33" AND 45" ABOVE THE FLOOR.
Acorn Safety
a division of Acorn Engineering
Manual #7109-100-001
1"
3
* 35
"
8
REF
1
1
"
4
OD
TAILPIECE
3
5
"
8
SUPPLY
FLOOR LINE
3
4XØ
" MTG HOLES
8
FLOOR LINE
MOUNTING DETAIL
*42"
3
*40
"
8
* 36"
5
* 31
"
8
Company
™
Page 2 of 5
FINISHED
WALL
1
" NPT
2
SUPPLY
5
5
"
8
5
8
"
8
Revised: 07/23/13