Acorn Safety S0660-LH 설치, 작동 및 유지보수 지침 - 페이지 2
{카테고리_이름} Acorn Safety S0660-LH에 대한 설치, 작동 및 유지보수 지침을 온라인으로 검색하거나 PDF를 다운로드하세요. Acorn Safety S0660-LH 5 페이지. Eyewash/facewash
Installation & Operation Manual
PRELIMINARY STEPS
1. Read the installation instructions prior to beginning the installation.
2. Separate parts from packaging and verify all necessary parts are accounted for and undamaged. Obtain missing or
damaged parts from Acorn Safety prior to beginning installation. See page 4.
3. Flush water supply line prior to installation. This will remove unwanted debris from the lines and prevent unwanted
blockages in the safety equipment.
4. In order to comply with ANSI Z358.1, the safety equipment must be inspected periodically. An inspection tag is
provided for documentation purposes.
5. All employees at risk of eye contamination should be informed and trained in the use of this and any other safety
equipment. The signage provided should be posted appropriately in close proximity as required by ANSI and
OSHA.
ROUGH-IN
5 5 8 "
(143)
Acorn Safety
a division of Acorn Engineering Company™
Manual #7109-400-001
2 1 2 "
(64)
16 1 4 "
(413)
100°"
2"
(51)
1/2" NPT
SUPPLY
SUPPLY
Ø 1 2 "
3 1 8 "
(13)
NPT SUPPLY
(79)
4 7 8 "
(124)
2 1 2 "
(63)
SUPPLY
20 1 8 "
(511)
5"
(127)
3 1 2 "
(89)
Page 2 of 5
Ø2"
(51)
4X Ø1/4"-20
(6)
TAPPPED
HOLE
MOUNTING DETAIL
Revised: 01/07/2013