CAMDEN CX-EPD1289L 설치 지침 매뉴얼 - 페이지 3

{카테고리_이름} CAMDEN CX-EPD1289L에 대한 설치 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. CAMDEN CX-EPD1289L 7 페이지. Electric preload rim strike

8
2. Secure strike in place with the 1/4-20 x 1-1/4 ( 2 screws).
1. Using center line, measure 4
bottom, and drill
3. Close the door (Ensure crash bar latch does not touch keeper
while closing the door) if necessary, adjust strike so that strike
2. Close door (Ensure crash bar latch does not touch keeper
and crash bar latch are well aligned.
1. Using center line, measure 4
while closing the door) if necessary, adjust strike so that strike
4. While adjusting strike, allow a small gap between strike body
bottom, and drill
Step 2: Aligning the Strike
and crash bar latch are well aligned,
and crash bar (approx.
1. Mark the location and drill the 5/8" diameter hole for the
4. While adjusting strike, allow a small gap between strike body
the remaining 2 middle mounting screw positions on frame.
electrical cable as per template or dimensions shown below.
1. Using center line, measure 4
2. Close door (Ensure crash bar latch does not touch keeper
and crash bar (approx.
5
2. Secure strike in place with the 1/4-20 x 1-1/4 (2 screws).
bottom, and drill
while closing the door) if necessary, adjust strike so that strike
'' hole for connecting wires, as per drawing.
5. Open the door and remove the strike from the frame, drill and
Ø
5. Open door and Remove strike. Drill threads at screws
8
thread the 2 middle mounting screw holes for the 1/4 - 20 x 1 -
3. Close the door (ensure crash bar latch does not touch keeper
and crash bar latch are well aligned,
position.
1/4 screws.
while closing the door). If necessary, adjust strike so that strike
4. While adjusting strike, allow a small gap between strike body
2. Close door (Ensure crash bar latch does not touch keeper
and crash bar latch are well aligned.
and crash bar (approx.
while closing the door) if necessary, adjust strike so that strike
6. Secure strike with all 1/4 - 20 x 1 - 1/4 screws and fix back the
4. While adjusting strike, allow a small gap between strike
and crash bar latch are well aligned,
5. Open door and Remove strike. Drill threads at screws
latch on the strike. Use the M3 x 6 to secure the strike cover.
body and crash bar (approximately 1/8"). Remove the latch
4. While adjusting strike, allow a small gap between strike body
position.
and crash bar (approx.
5. Open door and Remove strike. Drill threads at screws
position.
Horizontal
Centerline
Horizontal
HORIZONTAL
Centerline
CENTERLINE
Horizontal
Centerline
1
1
1
Top View
Latch
Latch
Jamb
Latch
Latch
4
4
4
4
3
'' top and
16
5
'' hole for connecting wires, as per drawing.
Ø
8
5
'' hole for connecting wires, as per drawing.
Ø
1
8
''). Remove the latch on strike and mark
8
3
'' top and
1
''). Mark remaining screws position.
16
8
1
''). Mark remaining screws position.
8
Jamb
1
''). Mark remaining screws position.
8
Jamb
Jamb
Jamb
Horizontal
Centerline
Horizontal
Horizontal
Centerline
Centerline
Horizontal
1
2
''
Centerline
2
1
2
Top View
Top View
Jamb
Top View
Jamb
Jamb
Allow a small gap between
strike body and crash bar
Allow a small gap between
strike body and crash bar
(Approx. 1/8'')
Crash Bar
Crash Bar
Crash Bar
3
'' top and
16
on strike and mark the remaining 2 middle mounting screw
positions on frame.
5. Open the door and remove the strike from the frame, drill
and thread the 2 middle mounting screw holes for the 1/4 - 20
x 1-1/4 screws.
6. Secure strike with all 1/4 - 20 x 1-1/4 screws and fix back the
Connecting
latch on the strike. Use the M3 x 6 screws to secure the strike
Wire hole
cover.
R+1''
5
''
Connecting
Ø
8
Connecting
R +
Wire Hole
R+1''
Connecting
R+1''
Ø
Wire hole
Ø 5 8 ''
R+ 3 4 ''
1
2
''
2
R+1''
5
''
1
8
5
''
Ø
8
3
''
R +
4 3
''
4
1
2
''
2
16
8 3
''
8
4 3
''
16
2
2
2
Closed
Closed Door
Door
Ensure latch does not touch
strike keeper while closing door,
and while adjusting strike
Allow a small gap between
Closed
strike body and crash bar.
Door
(Approx. 1/8'')
1
(Approx.
'')
Allow a small gap between
8
strike body and crash bar
(Approx. 1/8'')
Crash Bar
Crash Bar
5
Crash Bar
Crash Bar
Door Jamb

INSTALLATION

6. Connect wires as per drawing.
7. Door Status Sensor(Closed positi
7. Fix strike with remaining screws
White = NO
Orange = COM
(1/4-20 x 1
CX-EPD1289L Electric Preload RIM Strike
Grey = NC
for (2pcs) in the middle
POWER
INSTAL L AT ION INS T RUCT IONS
8. Door Status Sensor(Closed positio
6. Connect wires as per drawing.
White = NO
INSTALLATION INST
7. Fix strike with remaining screws
Orange = COM
(1/4-20 x 1
Grey = NC
for (2pcs) in the middle
6. Connect wires as per drawing.
POWER
8. Door Status Sensor(Closed pos
7. Fix strike with remaining screws
White = NO
1
(1/4-20 x 1
(4pcs) at both ends / 10-32 x 1
2
Orange = COM
for (2pcs) in the middle
Grey = NC
8. Door Status Sensor(Closed position)
POWER
White = NO
Orange = COM
Grey = NC
POWER
Red/Black,Blue/Green( 12VDC )
Wire hole
3
''
Red,Black/Blue,Green( 24VDC )
4
> Red / Green ( Short Black,Blue
Tighten Set
Screws onto
5
''
8
Fixing Bolts
3
''
R +
4
1/4-20 x 1-1/4
screws x 4pcs
3
Ensure latch does not touch
Ensure latch does not
strike keeper while closing door,
touch strike keeper while
3
closing door, and while
and while adjusting strike
adjusting strike.
Ensure latch does not touch
strike keeper while closing door,
and while adjusting strike
Closed
Door
Crash Bar
Door Jamb
Door Jamb
Door Jamb
5
5
1
INSTALLATION
(4pcs) at both ends / 1
2
Red/Black,Blue/Green
Red,Black/Blue,Green
> Red / Green ( Short
1
(4pcs) at both ends
2
Red/Black,Blue/Green(
Red,Black/Blue,Green(
> Red / Green ( Short B
Red/Black,Blue/Gree
Jamb
Red,Black/Blue,Gree
> Red / Green ( Shor
Jamb
Jamb
Jamb
3
3
Page 3 of 7
7
J
La
Mo