CAME AX5024 설치 매뉴얼 - 페이지 13

{카테고리_이름} CAME AX5024에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. CAME AX5024 16 페이지. Operator for swing gates
CAME AX5024에 대해서도 마찬가지입니다: 설치 매뉴얼 (16 페이지)

CAME AX5024 설치 매뉴얼

7 Maintenance

Extraordinary maintenance
Before doing any maintenance, cut off the power supply, to prevent any hazardous situations caused by accidentally activating the operator.
Periodic maintenance log kept by users (every six months)
Date
Extraordinary maintenance
The following table is for logging any extraordinary maintenance jobs, repairs and improvements performed by specialized contractors.
 Any extraordinary maintenance jobs must be done only by specialized technicians.
Extraordinary maintenance log
Installer's stamp
Job performed
______________________________________________________________________________________
__________________________________________________________________________________________________
______________________________________________________________________________________________
Installer's stamp
Job performed
______________________________________________________________________________________
__________________________________________________________________________________________________
______________________________________________________________________________________________
Notes
Name of operator
Job performed on (date)
Technician's signature
Requester's signature
Name of operator
Job performed on (date)
Technician's signature
Requester's signature
Signature